| PROTILE'S EXCLUSIVE PROCEDURE LISTS |
| P1 | SETTING UP PROCESS (FLOORS) |
| P2 | SETTING UP PROCESS (FURNITURE) |
| P3 | SETTING UP PROCESS (EXTERIORS) |
| P4 | DOOR REMOVAL |
| P5 | PREPARING THE BATHROOM |
| P6 | COMMODE REMOVAL |
| P7 | VANITY /CT/LAVA. FAUCET REMOVAL |
| P8 | DECONSTRUCTING SHOWER |
| P9 | SHOWERDRAIN INSTALLATION / CONCRETE |
| P10 | WOOD RECONSTRUCTION |
| P11 | FAUCET INSTALLATION |
| P12 | SHOWERPAN 40 MIL INSTALLATION |
| P13 | LIGHT/HEATER/VENT INSTALLATION |
| P14 | SHEETROCK INSTALLATION |
| P15 | HARDI-BOARD/DUROCK |
| P16 | MUD SETTING THE TOP & INSIDE OF CURB |
| P17 | SHOWERBENCH CONSTRUCTION |
| P18 | SET-UP FOR SHOWER TILE INSTALLATION |
| P19 | WET SAW |
| P20 | GROUTING & FINISH PLUMBING SHOWER |
| P21 | MUDPACKING SHOWERPAN |
| P22 | GROUT SHOWER FLOOR |
| P23 | SLIDING SHOWER DOOR INSTALLATION |
| P24 | RESTROOM FLOOR TILE INSTALLATION |
| P25 | VANITY INSTALLATION |
| P26 | R & R MEDICINE CABINET INSTALLATION |
| P27 | LAVATORY, FAUCET,& DRAIN INSTALLATION |
| P28 | COMMODE INSTALLATION |
| P29 | GROUTING RR FLOOR |
| P30 | WRAP UP PHASE |
| P31 | DECONSTRUCTING TUB-TOP |
| P32 | TUB REMOVAL |
| P33 | DECONSTRUCTING TT & WAIN COATING |
| P34 | SET-UP FOR TILE INSTALLATION |
| P35 | GROUTING & FINISH PLUMBING TUB-TOP |
| P36 | TAPE& FLOATING HARDI BACKER JOINTS |
| P37 | FLOOR TILE INSTALLATION |
| P38 | TUB INSTALLATION |
| P39 | DECONSTRUCTING FIBERGLASS |
| P40 | GROUTING FLOOR |
| P41 | LAVA. & FAUCET REMOVAL |
| P42 | LAVATORY, FAUCET, DRAIN INSTALLATION |
| P43 | PAINTING |
| P44 | SETTING UP PHASES |
| P45 | TUB TO SHOWER DRAIN CONVERSION |
| P46 | SHOWER DOOR PIVOT TYPE INSTALLATION |
| P47 | THINGS TO DO |
| P48 | ZEE BAR INSTALLATION |
| P49 | SHOWERDRAIN INSTALLATION ON PAN |
| P50 | MOLDING D&R OR REPLACEMENT |
| P51 | GRAB BAR INSTALLATION |
| P52 | ANGLE STOP REPLACEMENTS |
| P53 | CLOSET FLANGE REPLACEMENT |
| P54 | GLASS BLOCK INSTALLATION ON WINDOW OPENING |
| P101 | DOOR ENLARGEMENT |
| P102 WALLPAPER REMOVAL |
| P103 | HEATER LIGHT EXHAUSTFAN INSTALLATION |
| |
| P1 | SETTING UP PROCESS (FLOORS) |
| |
| SETTING UP THE JOB SITE |
| |
| THIS PART OF THE JOB IS TO INSURE THAT NOTHING THAT BELONGS TO THE |
| HOMEOWNER WILL BE DAMAGED WHILE WE ARE THERE FULL-FILLING OUR OBLIGATIONS |
| |
| TOOLS NEEDED : |
| BLADE, SCISSORS, MEASURING TAPE, |
| WEIGHTS TO HOLD DOWN PAPER |
| |
| MATERIALS NEEDED : |
| CONTRACTORS PAPER, PAINTER'S TARPS, CANVASSES, |
| BLUE PAINTER'S MASKING TAPE, STANDARD MASKING TAPE, AND TRANSPARENT TAPE |
| |
| PROCEDURE : |
| RELOCATE ANY AND ALL ITEMS OF FURNISHING THAT MAY BE IN THE WAY OF |
| WHERE WE WILL BE WORKING AT AND THROUGH. |
| LAY OUT THE PAPER AND TAPE IT DOWN WITH MASKING TAPE AS YOU GO ALONG |
| LAY OUT THE PAPER IN AS STRAIGHT LINE AS POSSIBLE AS TO NOT TRIP |
| WHILE WE ARE WORKING |
| START THE LAYOUT FROM THE WORK SITE TO THE FRONT DOOR |
| ALSO LAY SOME PAPER DOWN OUT OF THE WAY TO SIT THE TOOL BOXES |
| WHILE THEY ARE IN USE FOR THE DURATION OF THIS REMODELING PROJECT |
| LAY DOWN THE PAINTER'S TARPS WHERE WE WILL BE WALKING ON THE CARPET |
| |
| |
| |
| |
| P2 | SETTING UP PROCESS (FURNITURE) |
| |
| TOOLS NEEDED : |
| BLADE, SCISSORS, MEASURING TAPE, |
| |
| MATERIALS NEEDED : |
| PAINTER'S PLASTIC TARPS, |
| |
| PROCEDURE : |
| MEASURE ALL THE FURNISHING THAT WILL BE PROTECTED |
| CUT THE TARPS AND OPEN THEM UP |
| COVER THE FURNITURE AND TAPE THE PLASTICS TO THE FURNITURE |
| MAKE SURE THAT THE TARPS REACH ALL AROUND AND TO THE FLOOR |
| |
| |
| |
| |
| P3 | SETTING UP PROCESS (EXTERIORS) |
| |
| TOOLS NEEDED : |
| |
| MATERIALS NEEDED : |
| 16' X 20' BLUE TARP |
| SCRAP TO WEIGHT DOWN THE TARP TO PREVENT IT FROM MOVING |
| |
| PROCEDURE : |
| UNFOLD THE TARP AND LAY IT ACROSS THE DRIVEWAY. WEIGHT IT DOWN WITH |
| ITEMS HEAVY ENOUGH TO HOLD IT IN PLACE |
| CONTINUE BY OFF LOADING THE TOOL BOXES AND LAYING THEM ON THE TARP |
| |
| |
| |
| |
| P4 | DOOR REMOVAL |
| |
| TOOLS NEEDED: |
| PUTTY KNIFE , HAMMER , RYOBI SCREWGUN, SCREWDRIVER |
| |
| MATERIALS: |
| MASKING TAPE, SHARPIE MARKER, |
| |
| PROCEDURE |
| BANG OUT THE DOOR PINS WITH THE PUTTY KNIFE |
| IF THEY DO NOT COME OUT |
| USE THE SCREWGUN TO DISASSEMBLE THE HINGE |
| TAPE THE SCREWS AND HARDWARE TO THE TOP OF THE DOOR |
| STORE THE DOOR OUT OF THE WAY |
| |
| |
| |
| |
| P5 | PREPARING THE BATHROOM |
| |
| TOOLS NEEDED : |
| LOADED POUCH , SCREW GUN , STRING , THREE WAY EXTENSION CORD |
| WINDOW EXHAUST FAN , RYOBI SCREWGUN , STANDARD EXTENSION CORD |
| |
| |
| MATERIALS NEEDED : |
| 1 5/8" DRYWALL SCREWS, |
| |
| |
| PROCEDURE : |
| REMOVE ALL THE TOILETRIES AND SET THEM ASIDE. REMOVE ALL HARDWARE . |
| INSTALL THE EXHAUST FAN ON THE WINDOW SILL AND SECURE |
| SET UP THE TOOLS AND BUCKETS |
| |
| |
| |
| |
| P6 | COMMODE REMOVAL |
| |
| |
| TOOLS NEEDED : |
| VACCUME CLEANER ,, SMALL CHANNEL LOCKS , SMALL CRESCENT WRENCH |
| BLUE-WAY SCREWDRIVER |
| LATEX GLOVES , COMMODE PUTTY KNIFE , NEWS PAPER , BUCKET FOR TRASH |
| (POSSIBLE GRINDER, EAR PLUGS, SAFETY GLASSES, HANKERCHEIF ) |
| |
| MATERIALS NEEDED : |
| |
| PROCEDURE : |
| TURN OFF WATER SUPPLY |
| LAY FLOOR PROTECTION WHERE COMMODE WILL BE STORED |
| CONNECT THE VACCUME CLEANER W/WATER |
| REMOVE AND STORE THE COMMODE LID IN A SAFE PLACE |
| REMOVE THE WATER FROM THE COMMODE BOWL AND TANK |
| REMOVE 7/16" NUTS AND CLOSET BOLTS |
| DISCONNECT WATER SUPPLY LINE |
| REMOVE COMMODE & SET IT OUT OF THE WAY |
| CLEAN OFF WAX FROM COMMODE BOTTOM |
| CLEAN OFF CLOSET FLANGE WITH PUTTY KNIFE |
| CLEAN OFF PUTTY KNIFE WITH NEWSPAPER |
| STUFF NEWSPAPER OVER CLOSET FLANGE |
| SECURE PROTECTION OVER CLOSET FLANGE |
| TAKE VACCUME CLEANER OUT EMPTY , CLEAN , AND STORE AWAY |
| |
| |
| |
| |
| P7 | VANITY /CT/LAVA. FAUCET REMOVAL |
| |
| |
| TOOLS NEEDED : |
| LARGE AND SMALL CHANNEL LOCKS , SMALL CRESCENT WRENCH |
| SMALL GROUT BUCKET FOR WATER AND SPONGE |
| BASIN WRENCH , RYOBI LIGHT |
| |
| PROCEDURE |
| TURN OFF THE ANGLE STOPS |
| DISCONNECT 1 1/4" PVC OR BRASS PETE-TRAP LAVATORY DRAIN LINE |
| DISCONNECT SUPPLY LINES TO FAUCET |
| REMOVE COUNTER TOP END CAPS |
| REMOVE COUNTER TOP |
| REMOVE SCREW THAT ATTACH VANITY TO WALL |
| REMOVE VANITY |
| DISCARD ALL ITEMS THAT ARE NOT TO BE REUSED |
| |
| |
| |
| |
| P8 | DECONSTRUCTING SHOWER |
| THE REASON WE CALL IT DECONSTRUCTION IS BECAUSE WE TAKE EXTRA CARE |
| NOT TO CAUSE ANY LATERAL DAMAGE TO THE WORK AREA. |
| |
| TOOLS NEEDED : |
| PRIMARY AND SECONDARY TOOL BOXES , PRY BARS , ZAW-ZALL |
| THREE WAY EXTENSION CORD , EMPTY BUCKETS , BROOM , DUST PAN , SHOVEL |
| MASK , GOGGLES , GLOVES , EAR PLUGS , 5 LB HAMMER , PALITA , RYOBI |
| POWER SCRAPER, FOUR WAY SCREWDRIVER , ALL LEVELS , PENCILS |
| EXHAUST WINDOW FAN |
| |
| MATERIALS NEEDED : |
| |
| PROCEDURE : |
| SET UP WORK AREA, START BY REMOVING THE SHOWER DRAIN STRAINER, PLUG |
| UP THE DRAIN TO PREVENT DEBRIS FROM ENTERING THE DRAIN LINE , |
| INSTALL THE EXHAUST WINDOW FAN WITH EXTENSION CORD. REMOVE |
| THE SHOWER FLOOR WITH THE POWER SCRAPER , REMOVE ALL THE TRASH, |
| TAKE OF ALL THE CAPS, CUT OUT THE WALL WITH THE ZAW-ZALL, PRY THE WALLS |
| AWAY FROM THE 2X4S, REMOVE THE WALLS, CLEAN UP THE SHOWER WALLS OF |
| NAILS AND LEFTOVER SHOWER PAN MATERIAL, |
| |
| |
| |
| |
| P9 | SHOWERDRAIN INSTALLATION / CONCRETE |
| TOOLS NEEDED |
| PRIMARY, SECONDARY, & PLUMBING TOOL BOXES , ZAW-ZALL, HAMMER DRILL |
| THREE WAY EXTENSION CORD , EMPTY BUCKETS , BROOM , DUST PAN |
| MASK GOGGLES , GLOVES , EAR PLUGS , PALITA , RYOBI , POUCH |
| INSIDE TUBE CUTTER, TORPEDO LEVEL, MAKITA POWER SCRAPER |
| |
| MATERIALS NEEDED |
| 2" PVC DRAIN WITH/WITHOUT GASKET ????? |
| PVC PRIMER AND GLUE, MASKING TAPE, |
| 2"PVC PIPE , 3 2 " COUPLINGS, 1 1/2" TO 2" REDUCER |
| NO HUB COUPLING 1 1/2" TO 2" |
| 2" PVC PETE TRAP |
| |
| PROCEDURE |
| SET UP WORK AREA, START BY REMOVING THE SHOWER DRAIN, DIG INTO THE |
| FOUNDATION AS NEEDED TO REMOVE THE DRAIN OR TO GET ACCESS TO THE DRAIN |
| LINE, PREPARE THE DRAIN LINE FOR DRAIN INSTALLATION, CUT DRAIN LINE TO THE |
| RIGHT HEIGHT, INSTALL THE COUPLING, 2" PVC PIPE AND DRAIN, CHECK DRAIN |
| FOR LEVEL, TAPE UP THE STRAINER TO PREVENT DIRT FROM ENTERING THE |
| DRAIN LINE. MIX UP THE MUD TO BACK FILL ( WET MUD, PORTLAND AND SAND ONLY) |
| MIXING THE DRAIN MUD: |
| PUT ENOUGH PORTLAND AND SAND AS NEEDED IN A BUCKET |
| HAVE 2 BUCKETS OF WATER READY , MIX UP THE MIXTURE WITH WATER |
| USING THE SQUARE PALITA. IF LARGE AMOUNT OF CEMENT IS NEEDED |
| HOOK UP THE DRILL WITH THE MIXING PADDLE . |
| CLEAN UP ALL TOOLS AND BRING IN CEMENT. |
| |
| |
| |
| |
| P10 | WOOD RECONSTRUCTION |
| |
| TOOLS NEEDED: |
| PRIMARY, SECONDARY TOOL BOXES , PASLODE NAILER WITH FASTENERS |
| AIR COMPRESSOR, AIR HOSE, NAIL GUN, 8S & 12S NAILS, NAIL GUN OIL, |
| POWER DRIVER WITH NAILS & BLANKS, MASK, GOGGLES , EAR PLUGS, GLOVES, |
| POUCH W/ SCREWS, RYOBI, 2 ,3 ,4 ,6 ' LEVELS, CARPENTER'S PENCIL, |
| MEASURING TAPE, HORSES, ZAW-ZALL WITH METAL BLADE, THREE WAY CORD |
| SPEED SQUARE , CHALKING GUN , |
| |
| MATERIALS NEEDED |
| FASTENERS , SCREWS , 2X4S WHITE WOOD STUDS , 2X4 WALMANIZED |
| |
| PROCEDURE |
| HOOK UP THE COMPRESSOR AND NAIL GUN WITH OIL |
| HOOK UP THE SAFETY EQUIPMENT |
| BRING IN ALL THE OTHER TOOLS AS SPECIFIED |
| SET UP FOR CUTTING WOOD OUTSIDE AND INSIDE |
| INSPECT THE EXISTING STRUCTURE TO FORMULATE A SOLUTION TO RESTORE |
| THE STRUCTURE INTEGRITY OF THE SHOWER STALL |
| REPLACE ALL DAMAGED AND ROTTED FLOORPLATES |
| REINFORCE ALL WALL STUDS , RECONSTRUCT SHOWER CURB AND JAM |
| |
| |
| |
| |
| P11 | FAUCET INSTALLATION |
| REPLACING THE SHOWER OR THE TUB SHOWER FAUCET |
| |
| TOOLS NEEDED |
| PRIMARY AND SECONDARY AND PLUMBING TOOL BOXES / RIUBI |
| POUCH W SCREWS /FOUR WAY SCREW DRIVER / GREY TUBE CUTTER |
| CIRCULAR SAW, EXTENSION CORD, HORSES, SPEED SQUARE |
| ASSORTED PIPE WRENCHES AND CHANNEL LOCK PLIERS |
| ZAW-ZALL, TIN SNIPS, |
| |
| MATERIALS NEEDED |
| 2X4S WHITE WOOD STUDS ( INSIDE) |
| COPPER LINE & FITTING , PLUMBING STRAP, |
| SHOWER FAUCET |
| TEFLON TAPE |
| DRYWALL SCREWS |
| |
| PROCEDURE |
| TURN OFF THE WATER SUPPLY TO THE HOUSE AND DRAIN WITH SPICKET |
| SET UP WORK AREA WITH ALL THE TOOLS AND MATERIALS NEEDED. |
| FROM THE PLUMBING BOX RETRIEVE THE FOLLOWING: |
| TORCH, SOLDER, FLUX WITH THE BRUSH, 4 IN 1 SANDING TOOL, 4 COPPER |
| MALE ADAPTERS, COUPLINGS, 10' OF COPPER TUBING |
| 1 BUCKET OF WATER WITH A SPONGE, TEFLON TAPE, FIRE EXTINGUISHER |
| SAND ALL THE FITTINGS TO BE USED , PREP THE FAUCET |
| REMOVE OLD FAUCET, MODIFY SUPPLY LINES AS NEEDED |
| INSTALL 2X4 SUPPORT FOR FAUCET AND SHOWER HEAD |
| INSTALL NEW FAUCET AND CHECK FOR THE CORRECT DEPTH |
| PLUMB IN SHOWER HEAD SUPPLY LINE WITH EARED ELBOW |
| INSTALL NIPPLES WITH CAPS AS NEEDED |
| TURN ON WATER AND CHECK FOR LEAKS |
| |
| |
| |
| |
| P12 | SHOWERPAN 40 MIL INSTALLATION |
| |
| |
| TOOLS NEEDED |
| PRIMARY, SECONDARY, & PLUMBING TOOL BOXES , BLADE |
| PALITA, TIN SNIPS, BLADE, MAGIC MARKER, STAPLER AND STAPLES, |
| 7/16" DEEP SOCKET WITH QUARTER INCH RATCHET/ SCISSORS |
| |
| MATERIALS NEEDED |
| SHOWER PAN, PVC PRIMER AND GLUE, MASKING TAPE |
| |
| PROCEDURE |
| CLEAN UP SHOWER STALL FLOOR, LAY PAN OUT, STAPLE AS NEEDED, |
| MAKE FOLD ON CURB, CUT AS MARKED, |
| |
| |
| |
| |
| P13 | LIGHT/HEATER/VENT INSTALLATION |
| |
| TOOLS NEEDED |
| PRIMARY AND SECONDARY & ELECTRICAL TOOL BOXES /FOUR WAY SCREWDRIVER |
| THREE WAY EXTENSION CORD / ROTO ZIP AND TIPS / RIUBI |
| FOUR WAY SCREWDRIVER / ZAW-ZALL WITH SHEETROCK BLADE |
| YELLOW PIG TAIL ELECTRICAL TESTER / SCREW GUN / LOADED POUCH |
| SAFETY EQUIPMENT / FISH LINE |
| |
| MATERIALS NEEDED |
| LIGHT/HEATER/VENT UNIT / WIRE NUTS / ELECTRICAL TAPE / |
| LIGHT SWITCH WITH BOX |
| ROMEX |
| |
| PROCEDURE |
| BRING ALL ITEMS AND TOOLS NEED AS NOTED ABOVE. |
| STRAP ON POUCH, CUT CEILING AND INSTALL UNIT. |
| MAKE ALL CONNECTIONS TO THE UNIT, |
| RUN THE ROMEX TO GET ELECTRICAL POWER |
| TEST UNIT AND INSTALL ALL TRIMMINGS |
| |
| |
| |
| |
| P14 | SHEETROCK INSTALLATION |
| |
| PROCEDURE |
| TOOLS NEEDED |
| HORSES, CARPENTER'S PENCIL, BLADE, MEASURING TAPE |
| 4' LEVEL & STRAIGHT EDGES, CHALK LINE ,CHEESE GRADER |
| SHEETROCK SQUARE , LOADED POUCH , RIUBI COMBO SET, DRYWALL SCREWS |
| FASTENER BUCKET WITH ASSORTED SCREWS |
| MATERIALS NEEDED |
| SHEETROCK |
| |
| PROCEDURE |
| SET UP HORSES , PUT TWO 2X4S ACROSS THE HORSES, LAY SHEETROCK ON HORSES |
| MEASURE SHEETROCK, CUT AND GRADE , |
| BRING IN ALL CUTS. HOLD IN POSITION AND INSTALL |
| |
| |
| |
| |
| P15 | HARDI-BOARD/DUROCK |
| |
| PROCEDURE |
| TOOLS NEEDED |
| HORSES, GRINDER, CARPENTER'S PENCIL, CARBIDE SCORING TOOL, BLADE |
| EXTENSION CORD, VACCUME CLEANER WITH WATER , MASK, GOGGLES , EAR PLUGS |
| 4' LEVEL & STRAIGHT EDGES, CHALK LINE, WATER BUCKET AND SPONGE |
| |
| MATERIALS NEEDED |
| HARDI BOARDS |
| |
| PROCEDURE |
| CUT THE HARDI WITH THE GRINDER AND VACCUME CLEANER FOR DUST |
| BRUSH OFF HARDI WHEN CUT AND CLEAN OFF WITH WET SPONGE |
| |
| |
| |
| |
| P16 | MUD SETTING THE TOP & INSIDE OF CURB |
| |
| MUDSETTING IS A MIXTURE OF SAND , PORTLAND ,& MASONARY |
| THIS IS A WET MIXTURE TO ALLOW IT TO BE PLASTERED TO THE LATH |
| TOOLS NEEDED: |
| BATCH BOX, HOE, SHOVEL, 2 BUCKETS OF WATER,2 EMPTY BUCKETS, SPONGE |
| TARP, TIN SNIPS, MUD TROWEL, MUD HOG,, STAND AND MUD BOARD |
| 2' , 3', 4' AND TORPEDO LEVELS, SHOWER CURB C CLAMPS , HAMMER STAPLER |
| STAPLES, PALITAS, POINTER |
| |
| MATERIALS NEEDED |
| SAND , PORTLAND, MASONARY, METAL LATH,, BAKING SODA |
| LATEX GLOVES, 1X3 OR 1X4 FOR GAUGES |
| |
| PROCEDURE |
| CUT METAL LATH TO SPECIFIED SIZE, CUT 1X3s TO SIZE |
| INSTALL LATH |
| |
| LAYOUT THE TARP WHERE MUD WILL BE MIXED |
| MIX UP MUD IN BATCH BOX ON TARP |
| BRING IN MUD AND ALL THE TOOLS AND MATERIALS LISTED ABOVE |
| |
| |
| |
| |
| P17 | SHOWERBENCH CONSTRUCTION |
| |
| MUDSETTING IS A MIXTURE OF SAND , PORTLAND ,& MASONARY |
| |
| TOOLS NEEDED: |
| BATCH BOX, HOE, SHOVEL, 2 BUCKETS OF WATER,2 EMPTY BUCKETS, SPONGE |
| TARP, MUD TROWEL, MUD HOG,, STAND AND MUD BOARD |
| 2' , 3', 4' AND TORPEDO LEVELS, |
| TROWELS, PALITAS, POINTER, MALLET, |
| |
| MATERIALS NEEDED |
| SAND , PORTLAND, MASONARY ,CINDER BLOCKS, BAKING SODA |
| LATEX GLOVES, 1X3 OR 1X4 FOR GAUGES / SCRAPS/DEBRIS TO BACK FILL |
| THE HOLLOW AREAS IN THE CINDER BLOCKS |
| |
| PROCEDURE |
| LAYOUT THE TARP WHERE MUD WILL BE MIXED |
| MIX UP MUD IN BATCH BOX ON TARP |
| BRING IN MUD AND ALL THE TOOLS AND MATERIALS LISTED ABOVE |
| DRY SET THE CINDER BLOCKS TO CONFIRM THE LAY-OUT |
| |
| |
| |
| |
| P18 | SET-UP FOR SHOWER TILE INSTALLATION |
| WHILE DOING THIS PROCEDURE IT WILL BE NECESSARY TO DO A MODIFIED MUD |
| PACKING. |
| SEE MUD PACKING SHOWER FLOOR |
| TOOLS NEEDED |
| PRIMARY AND SECONDARY TOOL BOXES / TILE CUTTER WITH WD-40, NIPPERS, |
| STAND WITH MUD BOARD,2,3,4,6' LEVELS, CARPENTER'S PENCIL, SHARPIE, |
| SPEED SQUARE, THIN SET AND MASTIC TROWELS, PALITA AND POINTERS, |
| RYOBI LIGHT AND SCREW GUN, HAMMER, RUBBING STONE, WATER BUCKET& |
| SPONGE, TRASH BUCKET, CHEATERS, HAMMER DRILL & HOLE SAW WITH |
| EXTENSION CORD, SET-UP WET SAW, YELLOW SQUARE |
| MATERIALS NEEDED |
| WALL TILE, BASE, CAPS, MASTIC AND/OR THIN SET |
| |
| PROCEDURE |
| CLEAN AND SET UP WORK AREA, BRING IN ALL THE TILE, MUD PACKING, |
| MUD PACK THE EDGES, LEVEL OUT , SPREAD MASTIC THREE ROWS WITH BASE |
| INCLUDED, LEVEL OUT WALL TILE, CONTINUE SETTING TILE TO THE TOP |
| |
| FOR DESIGNED SHOWERS, CUT ALL THE NEEDED TILE ON THE WET SAW. |
| ALSO CUT ALL MITER CUTS FOR CAPS NEEDED ON THIS JOB |
| |
| INSTALL CADDY CORNERS AND CUT OUT FOR ALL ACCESSORIES |
| |
| |
| |
| |
| P19 | WET SAW |
| HOOK UP EXTENSION CORD, SET UP HORSES |
| SET UP WET SAW ON MUD BOARD ON TOP OF HORSES |
| HOOK UP WATER PUMP AND FILL WETSAW TUB WITH WATER |
| SPRAY WET SAW PLATE WHEELS WITH WD40 BEFORE USING |
| HAVE TEMP PLATES FOR CUT AND EMPTY BUCKET FOR TRASH |
| |
| |
| |
| |
| P20 | GROUTING & FINISH PLUMBING SHOWER |
| GROUT OUT ALL TILE WORK, INSTALL FAUCET TRIM PIECES, & ACCESSORIES |
| |
| TOOLS NEEDED |
| MIXER, EXTENSION CORD, PADDLE, TARP, BUCKETS, SPONGES, GROUT FLOATS |
| PALITA, POINTERS, GROUT BUCKET, SIFTER, HACK SAW, SHARPIE, CHANNEL LOCKS |
| FOUR WAY SCREW DRIVER, RYOBI, |
| |
| MATERIALS NEEDED |
| LATEX GLOVES, GROUT, 8 BUCKETS FILLED WITH WATER, MASKING TAPE |
| SOAP DISH, TOWEL BAR, TEFLON TAPE, FAUCET TRIM PIECES |
| |
| PROCEDURE |
| CLEAN AND SET UP WORK AREA, MASK ALL ALONG THE TILE EDGES |
| BRING IN TOOLS, FAUCET TRIM PIECES, GROUT, WATER, & SPONGES |
| SPREAD GROUT, CLEAN OFF ACCESS GROUT, INSTALL ACCESSORIES & CLEAN |
| POLISH TILE WORK, INSTALL FAUCET TRIM |
| REMOVE MASKING TAPE, CLEAN UP BATHROOM TILEWORK |
| |
| |
| |
| |
| P21 | MUDPACKING SHOWERPAN |
| |
| TOOLS NEEDED: |
| THIN SET TROWEL/ MUD TROWEL / POINTER / PALITA / MASK / LATEX GLOVES/ |
| STRAINER HOUSING / SHARPIE / TILECUTTER WITH WD40 / KNEE PADS/ |
| BEATER BOARDS / GRADERS / DUST PAN & BRUSH / NIPPERS / SPEED SQUARE |
| 2 & 3 FEET LEVELS / LIGHT / WETSAW SETUP / HOE / SHOVEL / SPONGES |
| 2 WHEEL DOLLY |
| MATERIALS NEEDED |
| SAND / PORTLAND CEMENT / FLOOR TILE / POWDER THIN SET / |
| |
| PROCEDURE MAKING THE MUD |
| LAYOUT THE TARP WHERE MUD WILL BE MIXED |
| SETUP MUD BOX / SHOVEL / HOE / 2 BUCKETS OF WATER / |
| BRING MATERIALS NEXT TO THE BOX |
| POUR IN SAND AND PORTLAND 3 PARTS SAND TO 1 PART PORTLAND |
| MIX WITH HOE AND SHOVEL AS NEEDED |
| ONCE THE MATERIALS ARE MIXED THOROUGHLY / START SPRINKLING |
| WATER OVER THE MATERIALS WITH A SPONGE. |
| PAY CLOSE ATTENTION NOT TO OVER SATURATE THE MIXTURE MAKING IT WET-MUD |
| SHIFT MUD BACK AND FORTH IN THE BATCH BOX UNTIL IT IS MOIST |
| FILL THE BUCKETS WITH THE MUD AND BRING INTO BATHROOM WITH DOLLY |
| BRING IN MUD AND ALL THE TOOLS AND MATERIALS LISTED ABOVE |
| AFTER MUD IS MADE CLEAN OFF ALL THE TOOLS USED |
| |
| PROCEDURE INSTALLING SHOWER DRAIN BEFORE MUD PACKING |
| |
| |
| |
| |
| P22 | GROUT SHOWER FLOOR |
| ITEMS NEEDED FOR GROUTING SHOULD ALREADY BE SET UP FROM |
| GROUTING SHOWER. |
| MAKE SURE THAT THE GROUT FOR THE SHOWER FLOOR IS VERY STIFF |
| |
| |
| |
| |
| P23 | SLIDING SHOWER DOOR INSTALLATION |
| |
| TOOLS NEEDED ; |
| PUNCH, HAMMER DRILL, 3/16" MASONRY DRILL BIT, POUCH |
| RYOBI SCREWGUN, HACKSAW, MEASURING TAPE, SHARPIE, |
| CHALKING GUN, 6-8 PLASTIC PLUGS, HAMMER, PENCIL, |
| WATER BUCKET & SPONGE, (EXTENSION CORD IF HAMMERDRILL IS USED) |
| |
| MATERIALS NEEDED: |
| SHOWER DOOR, CHALKING, SCREWS, |
| |
| PROCEDURE |
| OPEN UP DOOR PACKAGE, SORT OUT ALL THE HARDWARE |
| MAKE SURE ALL THE PIECES ARE THERE, |
| SETUP THE JOB SITE WITH ALL THE ABOVE TOOLS |
| MEASURE THE THRESHOLD AND CUT IT TO SIZE, |
| SET IT ON THE CURB, PLACE STRIKE JAM IN PLACE |
| PUNCH THE MARKS AND MAKE THE HOLE |
| INSERT THE PLUGS, LINE UP JAM AND INSTALL |
| MARK , DRILL, PLUG, AND INSTALL |
| MEASURE THE HEADER , CUT ,& PLACE |
| ASSEMBLE THE GLASS PANES WITH WHEELS |
| SMALLER OF THE PANE GOES ON THE OUTSIDE |
| ADJUST TO CLOSE PROPERLY |
| INSTALL BOTTOM GUIDES |
| INSTALL SHOWER DOOR HANDLES |
| SMALL ONE IN THE INSIDE PANEL |
| TOWEL BAR ON THE OUTSIDE PANEL |
| CHALK THE JAMS AND THRESHOLD |
| CLEAN UP AREA DOUBLE CHECK OPERATIONS ETC………. |
| |
| |
| |
| |
| P24 | RESTROOM FLOOR TILE INSTALLATION |
| |
| PROCEDURE |
| TOOLS NEEDED: |
| TARP, 3 WATER BUCKETS, EXTENSION CORD, DRILL MIXER, MIXING PADDLE |
| THIN SET BUCKET, 3 SPONGES, PALITA, POINTER, THIN SET TROWEL |
| MEASURING TAPE, SHARPIE, SPEED SQUARE, TILE CUTTER , CLOSET FLANGE |
| WD40, KNEES PADS, CARPENTER SQUARE, SPACERS, STRAIGHT EDGES |
| CHALK LINE, PRIMARY TOOL BOX, GRINDER & UNDER CUT SAW |
| WET SAW SET UP, 8" SCRAPER, ALL LEVELS |
| |
| MATERIALS NEEDED |
| TILE , THIN SET, SPACERS , MASKING TAPE , FINISH NAILS, |
| |
| PRE THE FLOOR |
| REMOVE THE SHOE MOLDING. CUT THE SEAM ON WALL AND FLOOR WITH THE BLADE |
| REMOVE FIXTURES , REMOVE THE FLOOR COVERING WITH SCRAPER , |
| DRY RUN LAYOUT, MIX THIN SET , SET TILE |
| |
| OUTSIDE PREP |
| ON THE TARP, CONNECT THE EXTENSION CORD , MIXER, & PADDLE |
| MIX THE THIN SET, CLEAN THE PADDLE, BRING IN THE THIN SET, |
| TILE, 1 WATER BUCKET WITH A SPONGE, |
| SET UP THE WET SAW STRATIGICLY |
| BRING IN ALL THE OTHER TOOLS LISTED ABOVE AS NEEDED |
| |
| |
| |
| |
| P25 | VANITY INSTALLATION |
| INSTALLATION OF THE BOTTOM CABINETS IN THE BATH ROOM |
| AND MEDICINE CABINET |
| |
| TOOLS NEEDED |
| PRIMARY AND SECONDARY TOOL BOXES / RIUBI / STUD FINDER / POUCH W SCREWS |
| 2 , 3 , & 4 FOOT LEVELS / FOUR WAY SCREW DRIVER / DRILL BIT SET |
| |
| MATERIALS NEEDED |
| CABINETS / WOOD CHIMES / DRYWALL SCREWS / |
| |
| PROCEDURE |
| SET UP WORK AREA |
| ASSEMBLE CABINETS AS NEEDED |
| PLACE CABINETS WHERE THEY ARE GOING TO BE INSTALLED |
| FASTEN CABINETS TO THE WALL FOR MORE THAN |
| ONE CABINET, FASTEN THE CABINETS TO EACH OTHER FIRST DRILLING |
| A PILOT HOLE TO AVOID SLITTING THE CABINETS THEN THE SCREWS |
| SHIM AND LEVEL BEFORE FINAL INSTALLATION |
| |
| |
| |
| |
| P26 | R & R MEDICINE CABINET INSTALLATION |
| |
| TOOLS NEEDED |
| SCREW GUN / STUD FINDER / POUCH AND SCREWS / PRY BAR / BLADE / PUTTY KNIFE / |
| SHEETROCK SAW / ROTO ZIP AND BITS / |
| |
| MATERIALS NEEDED |
| MEDICINE CABINET |
| |
| PROCEDURE |
| REMOVE OLD CABINET . MARK OUT WHERE THE NEW CABINET WILL GO . |
| MAKE THE NESSECARY MODIFICATION TO THE WALL TO ACCOMMODATE THE NEW CABINET |
| ASSEMBLE THE CABINET AS PER INSTRUCTIONS. |
| LEVEL THE CABINET AND INSTALL WITH DRY WALL SCREWS. |
| |
| |
| |
| |
| P27 | LAVATORY, FAUCET,& DRAIN INSTALLATION |
| |
| TOOLS NEEDED |
| PRIMARY AND SECONDARY & PLUMBING TOOL BOXES /FOUR WAY SCREWDRIVER |
| THREE WAY EXTENSION CORD / BROOM / DUST PAN / RIUBI / PRY BARS |
| FOUR WAY SCREWDRIVER , ASSORTED CHANNELS LOCKS & PIPE WRENCHES, |
| ASSORTED CRESCENT WRENCHES, BASIN WRENCH, ZAW-ZALL/ METAL BLADE |
| CHALKING GUN , BUCKET WITH WATER AND SPONGE |
| SPONGE FOR BACK WHILE LAYING IN THE CABINET |
| MATERIALS NEEDED |
| LAVATORY, TWO ANGLE STOPS, ASSORTED NIPPLES, 2 HALF INCH ESCUSIONS, |
| 1 1/2" ESCUSIONS FOR DRAIN LINE, 1 1/2" PETE TRAP, 1 1/4" TAIL PIPE EXTENSION |
| PLUMBER'S PUTTY, TEFLON TAPE, WD-40, 2 WATER SUPPLY LINES, |
| |
| PROCEDURE |
| TURN OFF WATER AND DRAIN SYSTEM BEFORE STARTING |
| SET UP WORK AREA, INSTALL THE FAUCET ON THE LAVATORY, INSTALL THE WATER |
| LINES ON THE FAUCET, INSTALL THE TAILPIPE AND STOPPER ASSEMBLY , INSTALL |
| THE ESCUSIONS AND ANGLE STOPS ON THE WALL, PREP DRAIN LINE COMING |
| OUT OF THE WALL. DROP IN SINK, HOOK UP WATER LINES, INSTALL DRAIN LINE, |
| CHALK SEAMS ON SINK, REMOVE FAUCET STRAINER ,TURN WATER ON, |
| BLEED DEBRIS FROM WATER LINE, REINSTALL STRAINER, CHECK FOR LEAKS |
| |
| |
| |
| |
| P28 | COMMODE INSTALLATION |
| |
| INSURE THAT THE BOTTOM OF THE COMMODE IS CLEAN |
| HANDLE THE COMMODE WITH CARE |
| |
| TOOLS NEEDED |
| 7/16" DEEP SOCKET / 1/4" RATCHET / MEDIUM CHANNEL LOCKS (BLUE) |
| BOLT CUTTERS / HACKSAW / SMALL BUCKET |
| |
| MATERIALS NEEDED |
| WAX RING / CLOSET BOLTS / ANGLE STOP / SUPPLY LINE/ |
| CHIMES OR SPARE CHANGE . |
| |
| PROCEDURE |
| TURN OFF WATER AND OPEN UP OUTSIDE WATER SPICKET TO DRAIN WATER LINE |
| INSTALL ANGLE STOP / ESCUSIONS AND SUPPLY LINE ( WHEN NEEDED) |
| PUT WAX RING ON THE BOTTOM OF THE COMMODE. |
| SET THE COMMODE INTO PLACE / BACK FILL WITH GROUT TO STABILIZE BASE |
| TIGHTEN UP THE CLOSET BOLTS AND CUT. MAKE SURE TO USE THE WASHERS |
| SHIM IN COMMODE AS NEEDED. |
| CONNECT WATER SUPPLY LINE AND BLEED DEBRIS |
| TURN ON WATER AND TEST FOR LEAKS |
| |
| |
| |
| |
| P29 | GROUTING RR FLOOR |
| |
| PROCEDURE |
| TOOLS NEEDED: |
| TARP, 5-8 WATER BUCKETS, EXTENSION CORD, DRILL MIXER, MIXING PADDLE |
| GROUT BUCKET, 3 SPONGES, PALITA, POINTER, GROUT FLOATS |
| MEASURING TAPE, SHARPIE, MASKING TAPE, NEEDLE NOSE PLIERS |
| WD40, KNEES PADS, PRIMARY TOOL BOX |
| |
| MATERIALS NEEDED |
| GROUT |
| |
| PROCEDURE |
| LAY OUT TARP AND WEIGHT IT DOWN , PUT THE GROUT, SIFTER, AND WATER |
| ON THE TARP, CONNECT THE EXTENSION CORD , MIXER, & PADDLE |
| MIX THE GROUT, CLEAN THE PADDLE, BRING IN THE GROUT AND WATER BUCKETS, |
| 3 SPONGES |
| BRING IN ALL THE OTHER TOOLS LISTED ABOVE AS NEEDED |
| REMOVE SPACERS / CLEAN FLOOR / GROUT OUT FLOOR |
| AFTER IT DRIES FOR A WHILE / CLEAN OFF ACCESS GROUT WITH MOIST SPONGES |
| POLISH FLOOR |
| |
| |
| |
| |
| P30 | WRAP UP PHASE |
| POLISH NEW TILE WORK |
| CLEAN UP WORK AREAS |
| CLEAN UP ALL TOOLS AND EQUIPMENT USED ON THIS JOB |
| STRAIGHTEN OUT VAN |
| LOAD UP ALL TOOLS AND TRASH |
| |
| |
| |
| P31 | DECONSTRUCTING TT |
| PROCEDURE LIST |
| IN THIS PROCEDURE IT IS NECESSARY TO PROTECT THE TUB |
| IF THE TUB IS NO TO BE REPLACED. |
| |
| TOOLS NEEDED: |
| |
| |
| MATERIALS |
| MASKING TAPE / PAPER / |
| PROCEDURE |
| MASK THE TUB AND LAY PAPER FOR PROTECTION |
| INSTALL EXHAUST WINDOW FAN W/ EXTENSION CORD |
| REMOVE THE FAUCET FIXTURES AND SAVE IN CABINET |
| REMOVE ALL THE VERTICAL TRIM TILE |
| DRAW A PLUM LINE WHERE WALLS WILL BE REMOVED |
| CONNECT ZALL-ZAW AND VACCUME CLEANER |
| MAKE 2 VERTICAL CUTS AS DRAWN AND ABOVE HORIZONTAL TILE |
| FIND STUDS AND REMOVE THE SMALL WALLS |
| REMOVE NAILS AND CONTINUE TO REMOVE BIG WALL |
| CLEAN UP WALL STUDS OF NAILS AND DEBRIS |
| |
| |
| |
| |
| P32 | TUB REMOVAL |
| PROCEDURE |
| TOOLS NEEDED: |
| RIUBI SCREWGUN / POUCH / STANDARD SCREWDRIVER / DUMBBELL DRAIN REMOVER |
| PRYBARS / HAMMER / SCRAPS OF 2X4S / POSSIBLE POWER SCRAPER |
| |
| MATERIALS NEEDED: |
| |
| PROCEDURE: |
| REMOVE ALL TUB HANGERS FASTENERS IF THEY ARE THERE |
| REMOVE THE TRIP LEVER AND FACING FROM TUB |
| REMOVE THE TUB DRAIN USING THE DUMBBELL OR TWO SCREWDRIVERS |
| CLEAN UP THE STUDS SO THE TUB WILL COME OUT EASILY |
| PRY BATHTUB OFF THE FLOOR |
| TAKE THE BATH TUB OUT TO THE YARD |
| CLEAN UP THE AREA WHERE THE BATH TUB WAS |
| |
| |
| |
| |
| P33 | DECONSTRUCTING TT & WAIN COATING |
| PROCEDURE LIST |
| IN THIS PROCEDURE IT IS NECESSARY TO PROTECT THE TUB |
| IF THE TUB IS NO TO BE REPLACED. |
| |
| TOOLS NEEDED: |
| PRIMARY AND SECONDARY TOOL BOXES / ZAW-ZALL / |
| THREE WAY EXTENSION CORD / EMPTY BUCKETS / BROOM / DUST PAN |
| MASK GOGGLES/ GLOVES / EAR PLUGS / PALITA / RIUBI / PRY BARS, |
| FOUR WAY SCREWDRIVER / STUD FINDER / LOADED POUCH/ CHANNEL LOCKS |
| CONNECT THE VACCUME CLEANER W/WATER / WINDOW FAN |
| POSSIBLE ALLEN WRENCH SET FOR TUB FILLER |
| |
| |
| MATERIALS |
| MASKING TAPE / PAPER / |
| |
| PROCEDURE |
| CUT AND SEPARATE THE EDGE OF ALL THE TRIM TILE TO BE REMOVED |
| REMOVE THE FAUCET FIXTURES AND SAVE IN CABINET |
| REMOVE ALL THE VERTICAL TRIM TILE |
| DRAW A PLUM LINE WHERE WALLS WILL BE REMOVED |
| CONNECT ZALL-ZAW AND VACCUME CLEANER |
| MAKE 2 VERTICAL CUTS AS DRAWN AND ABOVE HORIZONTAL TILE |
| FIND STUDS AND REMOVE THE SMALL WALLS |
| REMOVE NAILS AND CONTINUE TO REMOVE BIG WALL |
| CLEAN UP WALL STUDS OF NAILS AND DEBRIS |
| CONTINUE WITH ALL THE WALL WAINS COATING |
| |
| |
| |
| |
| P34 | SET-UP FOR TILE INSTALLATION |
| PROCEDURE |
| |
| TOOLS NEEDED |
| PRIMARY AND SECONDARY TOOL BOXES / TILE CUTTER WITH WD-40, NIPPERS, |
| STAND WITH MUD BOARD / ALL LEVELS, CARPENTER'S PENCIL, SHARPIE, |
| SPEED SQUARE, THIN SET AND MASTIC TROWELS, PALITA AND POINTERS, |
| RYOBI LIGHT AND SCREW GUN, HAMMER, RUBBING STONE, WATER BUCKET& |
| SPONGE, TRASH BUCKET, |
| |
| MATERIALS NEEDED |
| WALL TILE, CAPS, MASTIC AND/OR THIN SET |
| |
| |
| PROCEDURE |
| CLEAN AND SET UP WORK AREA, BRING IN ALL THE TILE, STAND, MUD BOARD |
| CHEATERS, WD-40, AND ACCESSORIES |
| MAKE LEVEL LINES , INSTALL TILE, AND CADDIES |
| CUT OUT FOR SOAP DISH, AND TOWEL BARS |
| |
| |
| |
| |
| P35 | GROUTING & FINISH PLUMBING TT |
| GROUT OUT ALL TILE WORK, INSTALL FAUCET TRIM PIECES, & ACCESSORIES |
| |
| |
| TOOLS NEEDED |
| MIXER, EXTENSION CORD, PADDLE, TARP, BUCKETS, SPONGES, GROUT FLOAT |
| PALITA, POINTERS, GROUT BUCKET, SIFTER, HACK SAW, SHARPIE, CHANNEL LOCKS |
| FOUR WAY SCREW DRIVER, RYOBI , CHALKING GUN |
| |
| |
| |
| MATERIALS NEEDED |
| LATEX GLOVES, GROUT, 8 BUCKETS FILLED WITH WATER, MASKING TAPE |
| SOAP DISH, TOWEL BAR, TEFLON TAPE, FAUCET TRIM PIECES |
| CHALKING |
| |
| |
| |
| PROCEDURE |
| CLEAN AND SET UP WORK AREA, MASK ALL ALONG THE TILE EDGES |
| BRING IN TOOLS, FAUCET TRIM PIECES, GROUT, WATER, & SPONGES |
| SPREAD GROUT, CLEAN OFF ACCESS GROUT, INSTALL ACCESSORIES & CLEAN |
| |
| NOTE: IT MAY BE NECESSARY TO SET UP FOR PLUMBING AT THIS TIME |
| PLUMBING BOX, COPPER PIPE, 2 MALE ADAPTERS, |
| PROCESS; SWEAT IN MALE ADAPTER, TEFLON TAPE IT , INSTALL IT |
| CUT TO SIZE, SWEAT MALE ADAPTER, TEFLON IT INSTALL TUB FILLER |
| CHALK THE ESCUSIONS |
| |
| POLISH TILE WORK, INSTALL FAUCET TRIM |
| REMOVE MASKING TAPE, CLEAN UP BATHROOM |
| |
| |
| |
| P36 | TAPE& FLOATING HARDI BACKER JOINTS |
| TOOLS NEEDED |
| BLADE / SCISSORS / COMPOUND CONTAINER / PALITA / DRILL MIXER / PADDLE / BUCKET |
| FLOATING KNIFES (ALL KNIFES INCLUDING CORNER KNIFE) / SPONGES / HAMMER / |
| SCREW GUN / BUCKET W/ WATER |
| |
| MATERIALS NEEDED |
| THIN SET / FIBERGLASS TAPE / |
| |
| PROCESS |
| SET UP TO MAKE THIN SET |
| MIX UP THIN SET AND BRING IN ALL THE TOOLS NEEDED AND THE THIN SET |
| PUT TAPE ON THE JOINTS AND FLOAT THEM OUT WITH THIN SET. |
| TOUCH UP THE FLOATED JOINTS |
| |
| |
| |
| |
| P37 | FLOOR TILE INSTALLATION |
| |
| PROCEDURE |
| TOOLS NEEDED: |
| TARP, 3 WATER BUCKETS, EXTENSION CORD, DRILL MIXER, MIXING PADDLE |
| THIN SET BUCKET, 3 SPONGES, PALITA, POINTER, THIN SET TROWEL |
| MEASURING TAPE, SHARPIE, SPEED SQUARE, GREEN TILE CUTTER |
| WD40, KNEES PADS, CARPENTER SQUARE, SPACERS, STRAIGHT EDGES |
| CHALK LINE, PRIMARY TOOL BOX, GRINDER & UNDER CUT SAW |
| WET SAW SET UP, 8" SCRAPER, ALL LEVELS , CLOSET FLANGE |
| |
| MATERIALS NEEDED |
| TILE , THIN SET, SPACERS |
| |
| PREP THE FLOOR |
| DO THE LAY OUT, BRING IN TILE |
| |
| PROCEDURE |
| LAY OUT TARP AND WEIGHT IT DOWN , PUT THE THIN SET AND WATER |
| ON THE TARP, CONNECT THE EXTENSION CORD , MIXER, & PADDLE |
| MIX THE THIN SET, CLEAN THE PADDLE, BRING IN THE THIN SET, |
| TILE, 1 WATER BUCKET WITH A SPONGE, |
| SET UP THE WET SAW STRATIGICLY |
| BRING IN ALL THE OTHER TOOLS LISTED ABOVE AS NEEDED |
| DRY RUN, CUT OUT CLOSET FLANGE, INSTALL TILE |
| |
| |
| |
| |
| P38 | TUB INSTALLATION |
| PROCEDURE |
| TOOLS NEEDED: |
| RIUBI SCREWGUN, POUCH, CIRCULAR SAW, EXTENSION CORD, |
| PLUMBING BOX OF TOOLS, MEASURING TAPE, 2', 3', & 4' LEVELS |
| STANDARD SCREWDRIVER, |
| |
| MATERIALS NEEDED: |
| TUB, TRIP/WASTE/& OVERFLOW, PLUMBER'S PUDDY,WD40 |
| DUMB BELL DRAIN TOOL, CARDBOARD FOR TUB PROTECTION |
| 1"X 3" OR 1"X4" ABOUT 61" LONG |
| |
| PROCEDURE: |
| AFTER THE OLD TUB IS REMOVED, CHECK FLOOR FOR LEVELNESS |
| MEASURE NEW TUB FROM THE FLOOR TO UNDER THE LIP, |
| FIND THE HIGH SIDE OF THE FLOOR , MARK THE MEASUREMENT TAKEN FROM |
| THE TUB, DRAW A LEVEL LINE ACROSS THE BACK WALL WHERE THE TUB |
| WILL BE INSTALLED, INSTALL A PIECE OF 1X3 AT THE LEVEL LINE |
| PREINSTALL THE DRAIN LINE ON THE TUB, |
| INSTALL THE TUB, MAKE NECESSARY ADJUSTMENTS TO THE DRAIN LINE |
| TIGHTEN UP DRAIN LINE. SPRAY WD40 ON BOTTOM DRAIN WHERE |
| PLUMBER'S PUTTY WILL BE. TIGHTEN UP BOTTOM DRAIN |
| INSTALL OVERFLOW COVER WITH BLACK GASKET INCLUDED |
| SCREW DRYWALL SCREWS RIGHT ABOVE TUB TO SECURE IT FROM |
| MOVING UP. RUN A WATER TEST FOR LEAKS. |
| |
| |
| |
| |
| P39 | DECONSTRUCTING FIBERGLASS |
| TUB/SHOWER COMBINATION |
| PROCEDURE LIST |
| |
| TOOLS NEEDED: |
| PRIMARY AND SECONDARY TOOL BOXES / ZAW-ZALL / |
| THREE WAY EXTENSION CORD / EMPTY BUCKETS / BROOM / DUST PAN |
| MASK GOGGLES/ GLOVES / EAR PLUGS / PALITA / RIUBI / PRY BARS, |
| FOUR WAY SCREWDRIVER / STUD FINDER / POUCH/ CHANNEL LOCKS |
| CONNECT THE VACCUME CLEANER W/WATER |
| POSSIBLE ALLEN WRENCH SET FOR TUB FILLER |
| |
| |
| PROCEDURE |
| REMOVE THE FAUCET FIXTURES AND SAVE IN CABINET |
| REMOVE TRIP/WASTE AND OVERFLOW UNIT |
| CONNECT ZALL-ZAW AND VACCUME CLEANER |
| MAKE 2 VERTICAL CUTS THROUGH THE TUBS BIG WALL |
| THIS WILL SEPARATE THE TUB INTO 3 PIECES |
| CUT AROUND FIBERGLASS UNIT SEAMS |
| REMOVE NAILS AND FREE UNIT FROM WALL |
| REMOVE PIECES |
| |
| P40 | GROUTING FLOOR |
| |
| PROCEDURE |
| TOOLS NEEDED: |
| TARP, 5-8 WATER BUCKETS, EXTENSION CORD, DRILL MIXER, MIXING PADDLE |
| GROUT BUCKET, 3 SPONGES, PALITA, POINTER, GROUT FLOAT |
| MEASURING TAPE, SHARPIE, MASKING TAPE, NEEDLE NOSE PLIERS |
| WD40, KNEES PADS, PRIMARY TOOL BOX |
| |
| |
| |
| MATERIALS NEEDED |
| GROUT |
| |
| PROCEDURE |
| LAY OUT TARP AND WEIGHT IT DOWN , PUT THE GROUT, SIFTER, AND WATER |
| ON THE TARP, CONNECT THE EXTENSION CORD , MIXER, & PADDLE |
| MIX THE GROUT, CLEAN THE PADDLE, BRING IN THE GROUT AND WATER BUCKETS, |
| 3 SPONGES |
| BRING IN ALL THE OTHER TOOLS LISTED ABOVE AS NEEDED |
| |
| P41 | LAVA. & FAUCET REMOVAL |
| |
| |
| TOOLS NEEDED: |
| LARGE AND SMALL CHANNEL LOCKS , SMALL CRESCENT WRENCH/ |
| SMALL GROUT BUCKET FOR WATER , SPONGE |
| BASIN WRENCH , RYOBI LIGHT , LOADED POUCH , PUTTY KNIFE |
| |
| PROCEDURE |
| INSURE THAT THE WATER HAS BEEN TURNED OFF IF THE ANGLE STOPS |
| ARE TO BE REMOVED. |
| TURN OFF THE ANGLE STOPS , PLACE THE GROUT BUCKET UNDER THE |
| PETE-TRAP TO PREVENT THE WASTE WATER FROM FLOODING THE BOTTOM |
| OT THE VANITY CABINET. |
| DISCONNECT 1 1/2" PETE-TRAP AND DRAIN LINE , DRAIN OUT ALL THE WATER |
| |
| |
| DISCONNECT SUPPLY LINES FROM THE FAUCET |
| SEPARATE SINK FROM COUNTER TOP IF THE COUNTER TOP IS A TWO PIECE UNIT |
| REMOVE LAVATORY SINK |
| CLEAN UP ALL WATER AND DEBRIS FROM THE WORK AREA AND |
| PREPARE FOR THE FOLLOWING STEPS |
| |
| P42 | LAVATORY, FAUCET, DRAIN INSTALLATION |
| CULTURE COUNTER TOP INSTALLATION |
| |
| |
| |
| TOOLS NEEDED |
| PRIMARY AND SECONDARY & PLUMBING TOOL BOXES /FOUR WAY SCREWDRIVER |
| THREE WAY EXTENSION CORD / BROOM / DUST PAN / RIUBI / PRY BARS |
| FOUR WAY SCREWDRIVER , ASSORTED CHANNELS LOCKS & PIPE WRENCHES, |
| ASSORTED CRESCENT WRENCHES, BASIN WRENCH, ZAW-ZALL/ METAL BLADE |
| CHALKING GUN , BUCKET WITH WATER AND SPONGE |
| SPONGE FOR BACK WHILE LAYING IN THE CABINET |
| MATERIALS NEEDED |
| CULTURE COUNTER TOP WITH THE END CAPS |
| LAVATORY, TWO ANGLE STOPS, ASSORTED NIPPLES, 2 HALF INCH ESCUSIONS, |
| 1 1/2" ESCUSIONS FOR DRAIN LINE, 1 1/2" PETE TRAP, 1 1/4" TAIL PIPE EXTENSION |
| PLUMBER'S PUTTY, TEFLON TAPE, WD-40, 2 WATER SUPPLY LINES, |
| |
| |
| |
| PROCEDURE |
| SET UP WORK AREA, INSTALL THE FAUCET ON THE LAVATORY, INSTALL THE WATER |
| LINES ON THE FAUCET, INSTALL THE TAILPIPE AND STOPPER ASSEMBLY , INSTALL |
| THE ESCUSIONS AND ANGLE STOPS ON THE WALL, PREP DRAIN LINE COMING |
| OUT OF THE WALL. DROP IN SINK, HOOK UP WATER LINES, INSTALL DRAIN LINE, |
| CHALK SEAMS ON SINK, REMOVE FAUCET STRAINER ,TURN WATER ON, |
| BLEED DEBRIS FROM WATER LINE, REINSTALL STRAINER, CHECK FOR LEAKS |
| |
| P44 | SETTING UP PHASES |
| |
| CUTTING WOOD |
| OUTSIDE : HOOK UP EXTENSION CORD WITH THE THREE WAY PLUG |
| SET UP HORSES |
| CIRCULAR SAW WITH SPEED SQUARE, CARPENTER'S PENCIL,& MEASURING TAPE |
| LAY ALL WOOD TO BE CUT ON THE HORSES |
| WET SAW |
| HOOK UP EXTENSION CORD, SET UP HORSES |
| SET UP WET SAW ON MUD BOARD ON TOP OF HORSES |
| HOOK UP WATER PUMP IN FULL BUCKET OF WATER |
| SPRAY WET SAW WHEELS WITH WD40 BEFORE USING |
| HAVE TEMP PLATES FOR CUT AND EMPTY BUCKET FOR TRASH |
| HAVE ONE BUCKET FOR SCRAPS PIECES OF TILE AND |
| ANOTHER BUCKET FOR THE TILES WHICH HAVE BEEN CUT |
| MUD PACKING |
| LAYOUT THE TARP WHERE MUD WILL BE MIXED, LAY BATCH BOX ON TARP |
| BRING ALL THE FOLLOWING ITEMS TO THE TARP |
| BATCH BOX, TWO EMPTY BUCKETS, TWO BUCKETS OF WATER, SHOVEL, HOE |
| SPONGE , WATER BOTTLE SPRAYER, SAND, PORTLAND, BAGS OF PRE-MIXED |
| POUR THE SAND IN THE BOX , FOLLOWED BY THE PORTLAND, MIX WELL |
| ADD THE WATER AS NEEDED TO MAKE THE MUD PACK MUD |
| AFTER MUD IS MADE CLEAN OFF ALL THE TOOLS USED |
| TILE SETTING SETUP |
| PRIMARY AND SECONDARY TOOL BOXES / TILE CUTTER WITH WD-40, NIPPERS, |
| STAND WITH MUD BOARD,2,3,4,6' LEVELS, CARPENTER'S PENCIL, SHARPIE, |
| SPEED SQUARE, THIN SET AND MASTIC TROWELS, PALITA AND POINTERS, |
| RYOBI LIGHT AND SCREW GUN, HAMMER, RUBBING STONE, WATER BUCKET& |
| SPONGE, TRASH BUCKET, CHEATERS, HAMMER DRILL & HOLE SAW WITH |
| EXTENSION CORD, |
| FAUCET INSTALLATION |
| SET UP WORK AREA WITH ALL THE TOOLS AND MATERIALS NEEDED. |
| PRIMARY AND SECONDARY AND PLUMBING TOOL BOXES / RIUBI |
| POUCH W SCREWS /FOUR WAY SCREW DRIVER / GREY TUBE CUTTER |
| CIRCULAR SAW, EXTENSION CORD, HORSES, SPEED SQUARE |
| ASSORTED PIPE WRENCHES AND CHANNEL LOCK PLIERS |
| ZAW-ZALL, TINSNIPS, |
| FROM THE PLUMBING RETRIEVE THE FOLLOWING |
| TORCH, SOLDER, FLUX WITH THE BRUSH, 4 IN 1 SANDING TOOL, |
| MALE ADAPTERS, COUPLINGS, 10' OF COPPER TUBING |
| 1 BUCKET OF WATER WITH A SPONGE, TEFLON TAPE, |
| 2X4S WHITE WOOD STUDS |
| COPPER FITTING , PLUMBING STRAP, |
| SHOWER FAUCET |
| TEFLON TAPE |
| DRYWALL SCREWS |
| CUTTING SHEETROCK |
| LAY ALL SHEETROCK ON AN EVEN AREA |
| SHEETROCK SQUARE, CHALK LINE, MEASURING TAPE, CARPENTER'S PENCIL |
| RASP, STRAIGHT EDGES & 4' LEVEL, BLADE, |
| HARDI-BOARD/DUROCK |
| HORSES, GRINDER, CARPENTER'S PENCIL, CARBIDE SCORING TOOL, BLADE |
| EXTENSION CORD, VACCUME CLEANER WITH WATER , MASK, GOGGLES , EAR PLUGS |
| 4' LEVEL & STRAIGHT EDGES, CHALK LINE, SUPER HARDIE WET SAW |
| |
| P45 | TUB TO SHOWER DRAIN CONVERSION |
| |
| TOOLS NEEDED |
| PRIMARY, SECONDARY, & PLUMBING TOOL BOXES , ZAW-ZALL, HAMMER DRILL |
| THREE WAY EXTENSION CORD , EMPTY BUCKETS , BROOM , DUST PAN |
| MASK GOGGLES , GLOVES , EAR PLUGS , PALITA , RYOBI , POUCH |
| INSIDE TUBE CUTTER, TORPEDO LEVEL, MAKITA POWER SCRAPER |
| MAKITA SUPER DEMOLITION HAMMER , EXHAUST FAN , WET-VAC |
| |
| MATERIALS NEEDED |
| 2" PVC DRAIN WITH/WITHOUT GASKET ????? |
| PVC PRIMER AND GLUE, MASKING TAPE, |
| 2"PVC PIPE , 3 2 " COUPLINGS, 1 1/2" TO 2" REDUCER |
| NO HUB COUPLING 1 1/2" TO 2" |
| 2" PVC PETE TRAP |
| |
| PROCEDURE |
| SET UP WORK AREA , START ESCAVALTING THE FOUNDATION TO FACILITATE ACCESS |
| TO THE DRAIN SYSTEM / ONCE THIS HAD BEEN ACHIEVED, REMOVE THE TRIP, |
| WASTE , AND OVERFLOW DRAIN TO TUB CONNECTIONS / REMOVE THE EXISTING |
| PETE-TRAP / CONVERT THE TUB DRAIN SYSTEM TO ACCOMMODATE THE NEW |
| SHOWER DRAIN / INSTALL A 2" PETE-TRAP / RUN THE 2" PVC LINE WILD / MEASURE |
| THE CORRECT HEIGHT AND CUT . INSTALL 2" SHOWER DRAIN / ASSURE THE TOP |
| OF THE DRAIN IS LEVEL / ATTACHE THE COVERING TO THE SHOWER DRAIN STRAINER |
| TO PREVENT DEBRIS FROM ENTERING THE DRAIN LINE SYSTEM / |
| ONCE THIS PORTION OF THE REPAIR IS COMPLETED SET UP FOR MORTAR WORK |
| AS DESCRIBED IN PROCEDURE NUMBER 16 WITH THE FOLLOWING EXCEPTION |
| THE MATERIAL TO BE MIXED WILL BE CONCRETE / BRING IN THE CONCRETE AND POUR |
| CLEAN UP ALL TOOLS AND PREPARE FOR THE FOLLOWING PROCEDURE |
| |
| P46 | SHOWER DOOR PIVOT TYPE INSTALLATION |
| |
| TOOLS NEEDED ; |
| PUNCH, HAMMER DRILL, 3/16" MASONRY DRILL BIT, POUCH |
| RYOBI SCREWGUN, HACKSAW, MEASURING TAPE, SHARPIE, |
| CHALKING GUN, 6-8 PLASTIC PLUGS, HAMMER, PENCIL, |
| WATER BUCKET & SPONGE, (EXTENSION CORD IF HAMMERDRILL IS USED) |
| SHARPIE MARKER , FOUR WAY SCREWDRIVER , |
| |
| MATERIALS NEEDED: |
| SHOWER DOOR, CHALKING, SCREWS, PLUGS , |
| |
| PROCEDURE |
| OPEN UP DOOR PACKAGE, SORT OUT ALL THE HARDWARE |
| MAKE SURE ALL THE PIECES ARE THERE, |
| SETUP THE JOB SITE WITH ALL THE ABOVE TOOLS |
| MEASURE THE THRESHOLD AND CUT IT TO SIZE, |
| SET IT ON THE CURB, PLACE PIVOT JAM IN PLACE |
| PUNCH THE MARKS AND DRILL THE CORRESPONDING HOLES |
| INSERT THE PLUGS, LINE UP THE PIVOT JAM AND INSTALL |
| ASSEMBLE AND INSTALL THE DOOR PANEL ON THE STRIKE JAM |
| MAKE ADJUSTMENTS TO THE PANEL SO IT WILL BE ABLE TO HOLD |
| THE STRIKE JAM IN PLACE TO MAKE IT'S POSITION |
| MARK THE LOCATION WHERE THE WALL WILL BE DRILLED |
| DRILL THE HOLES AND INSTALL THE PLUGS |
| INSTALL THE STRIKE JAM |
| MAKE NECESSARY ADJUSTMENT FOR PROPER DOOR OPERATION |
| INSTALL SHOWER DOOR HANDLE |
| CHALK THE JAMS AND THRESHOLD |
| CLEAN UP AREA DOUBLE CHECK OPERATIONS ETC………. |
| |
| P48 | ZEE BAR INSTALLATION |
| |
| PROCEDURE |
| TOOLS NEEDED: |
| POWER DRIVER, NAILS & BLANKS , POUCH, TIN SNIPS, MEASURING TAPE |
| PADDY KNIFE, 2X4 ABOUT 12" LONG, WEIGHTS LIKE SLEDGE HAMMER |
| AND TOOL BOXES TO HOLD DOWN CARPET WHILE IT IS BEING |
| PREPARED., PALITA, PRIMARY TOOL BOX, |
| |
| MATERIALS NEEDED: |
| ZEE BARS, TACK STRIP, |
| |
| PROCEDURE: |
| CUT THE CARPET WILD, WHERE THE ZEE BAR IS GOING TO BE INSTALLED |
| CUT THE ZEE BAR TO FIT ALONG WITH TACK STRIP. INSTALL THE ZEE BAR |
| UNDER WHERE THE DOOR WILL CLOSE. CUT THE PADDING 1/2" |
| SHY OF WHERE THE ZEE BAR WILL BE. TUCK IN THE CARPET |
| WITH THE PALITA AND BANG IT DOWN WITH THE HAMMER |
| P49 | SHOWERDRAIN INSTALLATION ON PAN |
| |
| TOOLS NEEDED : |
| BLADE / 1/4" SMALL RATCHET WITH 7/16" SOCKET / SMALL & MED. CHANNEL LOCKS |
| SMALL CRESCENT WRENCH / LASER AND SMALL LEVELS / SPONGE / BUCKET OF WATER |
| |
| MATERIALS NEEDED: |
| TOP SHOWER DRAIN FLANGE / STRAINER AND HOUSING / MASKING TAPE / |
| PVC PRIMER AND GLUE / |
| |
| PROCEDURE ; |
| CLEAN OF SHOWER PAN WHERE THE DRAIN IS / CUT OUT THE HOLES FOR THE |
| SHOWER DRAIN BOLTS / CUT OUT THE PAN IN CENTER OF THE DRAIN LINE |
| APPLY PRIMER BETWEEN DRAIN AND PAN / THEN APPLY GLUE TO SAME |
| INSTALL TOP FLANGE AND TIGHTEN UP BOLTS |
| COVER THE STRAINER WITH MASKING TAPE TO PREVENT MUD FROM ENTERING DRAIN |
| INSTALL STRAINER / ADJUST DRAIN TO THE RIGHT HEIGHT |
| 1/4" LOWER THAN THE BASE TILE / THIS WILL ALLOW DRAIN OF WATER WHEN |
| TILE IS INSTALLED |
| |
| P50 | MOLDING D&R OR REPLACEMENT |
| |
| TOOLS NEEDED : |
| COMPRESSOR , FINISH NAIL GUN , NAIL GUN OIL , DIKES , HAMMER |
| NAIL PUNCH , POWER MITER SAW , SQUARE , MEASURING TAPE , PENCIL , |
| 4" DIAMOND BLADE GRINDER , COPING SAW , PRY BAR , CHALKING GUN |
| LOADED POUCH , 5 IN 1 PAINTER'S TOOL , EMPTY BUCKET AND SPONGE |
| ADJUSTABLE SQUARE , MASKING TAPE |
| |
| |
| MATERIALS NEEDED : |
| SHOE AND BASE MOLDING AS REQUIRED |
| FINISH NAIL 6S AND 8S |
| CHALKING AND WOOD FILLER |
| |
| |
| |
| |
| |
| PROCEDURE ; |
| SET UP THE HORSE WITH THE MUD BOARD. SET THE MITER SAW ON SAME |
| RUN THE ELECTRICAL POWER TO THE TOOLS TO BE USED OUTSIDE |
| BRING ALL THE MATERIAL NEEDED TO THE WORK SITE |
| GRIND OFF ALL THE NAILS FROM THE MOLDING TO BE REUSED IF ANY |
| MEASURE AND CUT THE MOLDING AS IT WILL BE INSTALLED |
| SET UP THE COMPRESSOR INSIDE , CONNECT THE AIR HOSE AND NAIL GUN |
| CUT AND INSTALL BASE MOLDING FIRST AND CONTINUE WITH THE SHOE MOLDING |
| COPE ALL END PIECES OF THE MOLDING TO FIT CORRECTLY |
| COUNTER PUNCH ALL FINISH NAILS AND FILL IN WITH WOOD FILLER |
| USING THE MASKING TAPE , MASK THE FLOOR AND THE WALL TO PREVENT |
| CHALKING SMEARS |
| CHALK ALL SEAMS OF THE MOLDINGS |
| CLEAN UP ALL EXCESS CHALK WITH A WET SPONGE |
| CLEAN UP AREA , PUT AWAY ALL TOOLS AND EQUIPMENT USED AND |
| PREPARE FOR THE FOLLOWING PROCEDURE |
| |
| P51 | GRAB BAR INSTALLATION |
| TOOLS NEEDED |
| HAMMERDRILL / EXTENSION CORD / RYOBI SCREW GUN WITH TIP AND BATTERY |
| DRILL BITS / MASKING TAPE / SHARPIE / MEASURING TAPE / DRYWALL SCREWS / |
| HAMMER / POUCH LOADED / SPONGE AND BUCKET / PRIMARY TOOL BOX / |
| STUD FINDER/ |
| |
| MATERIALS NEEDED |
| GRAB BARS / PLUGS / ANCHORS / WALL PLUGS SCREW IN TYPE / |
| |
| PROCEDURE |
| CONFER WITH THE CUSTOMER TO AGREE WHERE IS THE BEST LOCATION |
| FOR THE GRAB BARS TO BE INSTALLED. ONCE IT'S AGREED , CONTINUE WITH THE |
| FOLLOWING: TAPE THE END CAPS OF THE GRAB BAR TO THE CENTER OF SAME |
| SO IT WILL NO INTERFERE WITH THE INSTALLATION. MARK THE TOP RIGHT SIDE |
| TO MAINTAIN THE CORRECT ORIENTATION . MARK THE WALLS WHERE THE ANCHORS WILL |
| BE INSTALL AND DRILL THE APPROPRIATE HOLES . INSTALL THE WALL ANCHORS AND |
| INSTALL THE GRAB BAR. TEST FOR STRENGTH AND INSTALL SCREW COVERS |
| REPEAT THE PROCESS ON ALL THE GRAB BAR TO BE INSTALLED |
| |
| P52 | ANGLE STOPS REPLACEMENTS |
| |
| |
| TOOLS NEEDED : |
| PRIMARY AND PLUMBING TOOL BOXES |
| SMALL , MEDIUM, AND LARGE PIPE WRENCHES , SMALL , MEDIUM CHANNEL LOCKS |
| INSIDE PIPE HOLDER , MEDIUM CRESCENT WRENCH , SMALL BUCKET , SPONGE |
| TORCH , BUTANE GAS , FLUX , SOLDER , EMORY CLOTH AND SCRUBBERS , |
| TORCH LIGHTER , SMALL AND MEDIUM TUBE CUTTERS , |
| |
| MATERIALS NEEDED : |
| HALF INCH ANGLE STOPS ( GALVANIZED AND COPPER) |
| HALF INCH ECSUSION ( GALVANIZED AND COPPER) |
| ASSORTED HALF INCH GALVANIZED PIPE NIPPLES |
| HALF INCH COPPER PIPE , MALE AND FEMALE COPPER ADAPTERS |
| TEFLON TAPE , THREADED JOINT COMPOUND , |
| WATER SUPPLY LINE ( 3/8" COMPRESSION INLET TO 5/8" COMMODE OUTLET ) |
| |
| |
| PROCEDURE : |
| INSURE WATER SUPPLY TO THE RESIDENCES HAD BEEN TURNED OFF |
| OPEN UP THE WATER HOSE SPICKET OUTSIDE TO DRAIN THE WATER SYSTEM |
| REMOVE THE COMMODE WATER SUPPLY LINE |
| OPEN UP THE ANGLE STOP AND DRAIN THE EXCESS WATER INTO THE SMALL BUCKET |
| ADJUST THE PIPE WRENCH TO HOLD THE GALVANIZED NIPPLE WHILE AT THE SAME |
| TIME ADJUST THE CRESCENT WRENCH ON THE ANGLE STOP. HOLD THE PIPE WRENCH |
| IN PLACE WHILE TURNING THE ANGLE STOP COUNTER-CLOCKWISE |
| INSURE THAT THE PIPE DOES NOT TURN BREAKING THE SEAL INSIDE THE WALL |
| REMOVE AND REPLACE THE 1/2" ECSUSION |
| APPLY TEFLON AND THREADED JOINT COMPOUND ON THE THREADS OF THE NIPPLE |
| HOLD THE NIPPLE IN PLACE WHILE INSTALLING THE NEW ANGLE STOP WITH THE |
| CRESCENT WRENCH ( THE USE OF THE CRESCENT IS TO PREVENT DAMAGE TO THE ANGLE STOP) |
| INSURE THAT THE FINAL POSITION ON THE ANGLE STOP IS AT 12 O'CLOCK |
| CLEAN UP THE AREA , PUT UP THE TOOLS , AND SET UP FOR THE NEXT PROCEDURE |
| |
| P53 | CLOSET FLANGE REPLACEMENT |
| |
| TOOLS NEEDED |
| PRIMARY, SECONDARY, & PLUMBING TOOL BOXES , HAMMER DRILL |
| THREE WAY EXTENSION CORD , EMPTY BUCKETS , |
| MASK GOGGLES , GLOVES , EAR PLUGS , PALITA , RYOBI , POUCH |
| INSIDE TUBE CUTTER, TORPEDO LEVEL, MAKITA POWER SCRAPER |
| |
| MATERIALS NEEDED |
| FOUR INCH ADJUSTABLE CLOSET FLANGE AND STANDARD REPLACEMENT FLANGE |
| FOUR INCH PVC LINE APPROXIMATELY 5 FEET LONG |
| THREE TO FOUR INCH PVC COUPLING |
| |
| |
| |
| PROCEDURE |
| SET UP AREA TO PREPARE FOR THE FOLLOWING WORK TO BE DONE |
| CLEAN OFF THE CLOSET FLANGE , REMOVE ALL THE WAX AND WAX RING |
| HEAT UP THE LEAD AND REMOVE IT FROM THE FLANGE |
| REMOVE THE CLOSET FLANGE ANCHORS AND REMOVE FLANGE |
| CLEAN UP THE AREA SO THE INSTALLATION OF THE NEW FLANGE WILL |
| NOT BE INTERFERED WITH . |
| MODIFY THE DRAIN LINE TO ACCEPT THE NEW CLOSET FLANGE |
| LINE UP THE FLANGE AND MARK WHERE THE FOUNDATION WILL HAVE TO BE DRILLED |
| DRILL THE HOLES IN THE FOUNDATION FOR THE ANCHORS |
| INSTALL THE FLANGE AND ANCHOR THEM DOWN WITH THE HARDWARE PROVIDED |
| WITH THE ANCHORS |
| MAKE SURE THE CLOSET BOLTS SLOTS ARE |
| IN THE 9 AND 3 O'CLOCK POSITION |
| |
| CHECK TO MAKE SURE THE FLANGE IS LEVELED. THIS IS VERY IMPORTANT BECAUSE |
| IF IS OFF EVEN SLIGHTLY A LOT OF THE WASTE WILL OVERFLOW AND OR BACKUP |
| INTO THE COMMODE BOWL AND ONTO THE FLOOR CREATING A FLOOD IN THE HOUSE |
| TAPE UP THE DRAIN INLET TO PREVENT DIRT FROM ENTERING THE |
| |
| DRAIN LINE. MIX UP THE MUD TO BACK FILL ( WET MUD, PORTLAND AND SAND ONLY) |
| MIXING THE DRAIN MUD: SEE PROCEDURE NUMBER 16 MUDSETTING |
| PUT ENOUGH PORTLAND AND SAND AS NEEDED IN A BUCKET |
| HAVE 2 BUCKETS OF WATER READY , MIX UP THE MIXTURE WITH WATER |
| USING THE SQUARE PALITA. IF LARGE AMOUNT OF CEMENT IS NEEDED |
| HOOK UP THE DRILL WITH THE MIXING PADDLE . |
| CLEAN UP ALL TOOLS AND BRING IN CEMENT. |
| |
| |
| P54 | |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| REMOVE DOOR FROM HENGIS |
| REMOVE CASEMENT MOLDING |
| REMOVE DOOR JAM |
| MARK AND CUT OUT OPENING FOR POCKET DOOR |
| REMOVE STUDS AND |
| |
| |
| |
| |
| |
| P101 | DOOR ENLARGEMENT |
| |
| TOOLS NEEDED: |
| PRIMARY, SECONDARY TOOL BOXES , PASLODE FINISH NAILER WITH FASTENERS |
| PRY BARS, PALITA, POINTER, HORSE STANDS |
| MASK, GOGGLES , EAR PLUGS, GLOVES, BLADE, HAMMER, |
| POUCH W/ SCREWS, RYOBI, 2 ,3 ,4 ,6 ' LEVELS, CARPENTER'S PENCIL, |
| MEASURING TAPE, ZAW-ZALL WITH METAL BLADE, |
| SPEED SQUARE , CHALKING GUN , |
| MITER SAW, |
| MATERIALS NEEDED |
| ASSORTED SCREWS , 2X4S WHITE WOOD STUDS , 2X6 OR 2X8 FOR HEADER |
| SHIMS ( WOOD, FIBER BOARD, LARGE AND SMALL |
| DOOR. CASEMENT MOLDING, DOOR LOCK, SPACKLING COMPOUND |
| |
| |
| |
| |
| |
| PROCEDURE |
| USE THE BLADE TO SCORE ALL AROUND THE CASEMENT AND SEPARATE THE CASEMENT FROM |
| THE WALLS. PRY-OFF THE CASEMENTS WITHOUT DAMAGING IT IF IT IS TO BE USED LATER. |
| USE THE RYOBI ZAW-ALL WITH A METAL BLADE TO REMOVE THE JAM FROM THE CRIPPLER |
| MARK THE INTERIOR WALL WHERE THE DOOR WILL BE LOCATED WITH A LEVEL |
| CUT OFF THE INSIDE OF THE WALL WHERE THE DOOR WILL BE. |
| MAKE SURE THERE IS NO ELETRICAL WIRES BEHINDE THE SHEETROCK |
| INSERT THE ZAW-ZALL WITH A LONG METAL BLADE BETWEEN THE HEADER AND SHEETROCK |
| CUT OFF THE NAILS CAREFULLY, REMOVE THE HEADER AND STUD. |
| CUTOFF BOTTOMPLATE WHERE THE DOOR WILL BE EXTENDING TOWARD |
| INSTALL NEW STUD , INSTALL THE HEADER, INSTALL THE CRIPPLER |
| CHECK FOR PLUMB AND LEVEL. . |
| PREPARE DOOR FOR INSTALLATION |
| INSTLL IN PLACE WITH THE LOCKING PINS IN DOOR LOCK AREA |
| INSTALL THE SHIMS TO MAKE LEVEL. INSTALLATION OF THE SHIMS WILL BE WHERE |
| THE HINGES ARE GOING TO BE INSTALLED. |
| AFTER DOOR IS TACKED UP. REMOVE LOCKING MECHNISM AND SCREW LARGE SCREW |
| THROUGH THE CENTER IF EACH HINGE INTO THE CRIPPLER THROUGH THE SHIMS. |
| CUT AND INSTALL CASEMENTS MOLDING WITH FINISH PASLODE NAIL GUN |
| OPEM, PREPARE,AND INSTALL DOOR LOCK. |
| CHECK FOR PROPER OPERATION |
| SET ALL FINISH NAILS AND SPACKLE AS NEEDED |
| |
| |
| P102 | WALLPAPER REMOVAL |
| |
| |
| |
| P103 | LIGHT/HEATER/VENT INSTALLATION |
| |
| TOOLS NEEDED |
| PRIMARY AND ELECTRICAL TOOL BOXES /FOUR WAY SCREWDRIVER |
| ROTO ZIP AND TIPS /RYOBI TOOL SETUP WITH CHARGER |
| FOUR WAY SCREWDRIVER / ZAW-ZALL WITH SHEETROCK BLADE |
| YELLOW PIG TAIL ELECTRICAL TESTER / SCREW GUN / LOADED POUCH |
| SAFETY EQUIPMENT / |
| |
| MATERIALS NEEDED |
| LIGHT/HEATER/VENT UNIT / WIRE NUTS / ELECTRICAL TAPE / |
| LIGHT SWITCH WITH BOX / ROMEX |
| |
| |
| PROCEDURE |
| BRING ALL ITEMS AND TOOLS NEED AS NOTED ABOVE. |
| STRAP ON POUCH, CUT CEILING AND INSTALL UNIT. |
| MAKE ALL CONNECTIONS TO THE UNIT, |
| RUN THE ROMEX TO GET ELECTRICAL POWER |
| TEST UNIT AND INSTALL ALL TRIMMINGS |