This project consisted of the following:
Deconstruction and preparation of this bathroom.
· Remove the shower faucet trim pieces ( handles, supply pipe, and shower head)
· Remove the tiled tub enclosure and expose the stud walls.
· Remove the cast iron bathtub.
· Remove the existing tub/shower faucet.
· Once this was completed, we continued with the reconstruction.
Reconstruction phase was as follows:
· Recess the foundation to facilitate the construction of the roll-in shower.
· Access the foundation and modify drain system to install shower drain.
· Frame in and reinforce shower stalls walls.
· Frame in two recesses to be tiled in later .
· Install 2” x 12” reinforcements between studs to support grab bars later.
· Make all modifications to the water supply lines needed.
· Installation of the two new shower faucets.
· Install backerboard and tape and float with thin-set mortar.
· Construction of the cinder block shower bench.
· Install 8” x 10” Merona ceramic tile with two diamond band designs.
· Installation of tile on all walls, ceiling, and shower floor.
· Trim tile color is bone 2” x 6” surface caps.
· Tile recess areas .
· Install 2” x 2” hexagon anti-slip ceramic tile on shower floor.
· Grout out all tile work in bone.
· Install 3 grab bars as directed by customer.
· Installation of the faucet trim, fixed and hand-held showerheads.
· Install a towel bar.
This and all projects are as easy as ABC.
Appoinment (we're always on time).
Browse our selection of accessories and materials.
Choose the date you want your project to be completed.
Click here to contact us 