eZaccessbathroomS.com

HOME
Grab Bars and Hand Rails
Handicap Bathrooms
Handicap Bathroom III
Handicap bathroom II
Handicap Bathrooms IV
Handicap Bathroom V
Handicap Bathroom VI
OFF-SET DOOR HINGES
NARROW DOOR REPLACEMENTS
Senior Friendly Bathrooms
Senior Friendly Baths II
Roll-in Showers
Roll-in Shower II
TUB TO SHOWER CONVERSION I
TUB TO SHOWER II
TUB TO SHOWER III
TUB TO SHOWER IV
TUB TO SHOWER V
TUB TO SHOWER VI
TUB TO SHOWER VII
LOW ENTRY TUB TO SHOWER I
TUB TO SHOWER (Premium)
TILED SHOWER & FIBER BASE
CLASSIC BATHROOMS
CLASSIC BATHROOM II
GLASS BLOCK SHOWER
LOTS OF TILED SHOWERS
TILED TUB ENCLOSURES
TILED TUB ENCLOSURES IV
TILED WHIRLPOOL ENCLOSURE
COMPLETE KITCHEN I
FLOOR TILE- COMPLETE HOME
CULTURE MARBLE
GLASS BLOCKS
TESTIMONIALS
ABOUT US
CONTACT US
YOUR UNFINISHED PROJECTS

 Senior friendly bathroom designs

832.202.8453

762 Arvana Houston, Tx

 

We removed the ceramic tiled garden tub enclosure and the backerboard.

The culture marble garden tub was also removed.

The foundation was recessed to convert the bathtub drain to a shower drain line.

The shower faucet was removed along with all the plumbing.

The new plumbing was raised and the new faucet was installed. This faucet was configured to accommodate both the hand-held and fixed showerhead. Both controlled with a single faucet.

The walls were reinforced with 2 x 4s as needed.

The shower pan installation was next.

Reinforcements for the grab bars were installed.

Installation of the water and mold proof backerboard was next.

Followed by tape and floating with thinset mortar and fiberglass tape.

The tile was then installed. The tile installed was 6" x 6" matte glazed ceramic tile.

The deco feature strip tile was installed.

The floor tile is also a 6" x 6" ceramic tile.

The accessories install was the resin shampoo caddy and soap dish.

Grout used on this project was bone.

The three handle polished brass shower faucet was installed.

Final installation of the showerheads and faucet trimmings.

The two showerheads were installed (fixed and hand-held).

The ceiling and walls in the bathroom and closet were replaced, tape and floated, primed, and painted (two coats).

The entry door to the bathroom was replaced with a 36" door. 

The door into the toilet room was removed and the opening was finished framed.

The casement molding for both the door and door opening were primed and painted to match the base molding.

The wall-mounted mirrors were replaced.

The ceiling light and exhaust fan were replaced.

The countertop, vanities, and lavatory faucets were also replaced.

All the finishes in this bathroom are in Polished Brass.

 
 
Complete bathroom remodeled with ROLL-IN SHOWER
Pause Stop Previous Next View full-sized photos
 Control the slide show here
 
 
 
* First name (required):

* Last name (required):
* E-mail address (required):

Phone number:
* Message (required):

 
 
 
 
 
 
All it takes to have that beautiful and functional
bathroom you've imagined is just one call.

 832.202.8453.